- Stars (0)
91 Downloads
Owner:
Version: 1.0.1
Last Updated: 25-03-2016 15:30
Wossink, A., Mitasova, H., McLaughlen, R. 2005. The Cost Effectiveness of Standard and Alternative Sediment and Turbidity Control Systems on Construction Sites in North Carolina. UNC-WRRI-360. UNC WRRI, Raleigh, NC.
BMP, construction, costs, erosion and sediment control, Model
A model was used to evaluate the effectivenss of erosion and sediment control practices and their associated costs. Stormwater management practices used in conjuction with ES&C practices were shown to be most cost effective and least complex to manage and plan.