Performance Enhancing Devices for Stormwater Best Management Practices: Biochar

Performance Enhancing Devices for Stormwater Best Management Practices: Biochar

Please Login to download this file

- Stars (0)

0 Downloads

Author: Chris Swann

Version: 1.0

Last Updated: 18-10-2019 14:01

Share

DescriptionPreviewVersions
Hirschman Water & Environment and Center for Watershed Protection 2018_PEDs for Stormwater BMPs - Biochar.pdf

Hirschman Water & Environment, LLC, Center for Watershed Protection, Inc. 2018. Performance Enhancing Devices for Stormwater Best Management Practices: Biochar – Roadside Ditch Management and PEDs. Center for Watershed Protection, Inc. & Chesapeake Stormwater Network.

Best management practice, Biochar, Design standards, Maintenance, Management, Performance enhancing devices, Water quality, PEDs, BMPs, Design, Soil amendments

This research report is a part of the Roadside Ditch Management and Performance Enhancing Devices project conducted by the Center for Watershed Protection, Inc. and the Chesapeake Stormwater Network, funded by the Chesapeake Bay Trust. This report subsection focuses on biochar amendments. It provides: a definition of and uses for biochar; sourcing and procurement guidance; details for material testing and mixing; a risk assessment; operations and maintenance considerations; qualifying conditions for implementation; and photos from example projects.

Leave a Reply

Your email address will not be published. Required fields are marked *